 Hello ladies and gents this is the Viking telling you that today we are talking about 

LONDON STADIUM

File:Olympic Stadium, London, 16 April 2012.jpg

Design brief

During London's bid for the games, promotional materials featured a main stadium with a roof "designed to wrap itself around the venue like muscles supporting the body", however at that time there had been no formal design brief agreed. While the bidding process was ongoing West Ham had talks with the ODA about contributing to the development of a multi-purpose stadium, should London win the bid. 

The government preferred to produce a brief for an athletics only stadium which would be largely disassembled after the games with the lower tier remaining in place as a permanent athletics facility to replace the Crystal Palace National Sports Centre. With the original Olympic design finalised and being built, the government had a change of heart and a bidding process for a multi-sport post-Olympic legacy was launched.

On 13 October 2006, London Organising Committee of the Olympic and Paralympic Games confirmed that it had selected Sir Robert McAlpine and Populous to start exclusive negotiations with, to fulfil the eventual design and build contract of the new Olympic Stadium after no other organisations met the bidding criteria.The stadium design was launched on 7 November 2007.


Original structure details

The construction of the stadium commenced three months early in May 2008 after the bowl of the stadium had been dug out and the area cleared. The building of the stadium was completed in March 2011 reportedly on time and under budget, with the athletics track laid in October 2011.

The stadium's track and field arena is excavated out of the soft clay found on the site, around which is permanent seating for 25,000, built using concrete "rakers". The natural slope of the land is incorporated into the design, with warm-up and changing areas dug into a semi-basement position at the lower end. Spectators enter the stadium via a podium level, which is level with the top of the permanent seating bowl. A demountable lightweight steel and pre-cast concrete upper tier was built up from this "bowl" to accommodate a further 55,000 spectators.

Olympic Stadium interior

The stadium is made up of different tiers; during the Games the stadium was able to hold 80,000 spectators. The base tier, which allows for 25,000 seats, is a sunken elliptical bowl that is made up of low-carbon-dioxide concrete; this contains 40 percent less embodied carbon than conventional concrete. The foundation of the base level is 5,000 piles reaching up to 20 metres (66 ft) deep. From there, there is a mixture of driven cast in situ piles, continuous flight auger piles, and vibro concrete columns. The second tier, which holds 55,000 seats, is 315 m (1,033 ft) long, 256 m (840 ft) wide, and 60 m (197 ft) high.

The stadium contains just under a quarter of the steel as the Olympic Stadium in Beijing for the 2008 Summer Olympics, approximately 10,700 tonnes (11,800 short tons). In addition to the minimal use of steel, which makes it 75 percent lighter[clarification needed], the stadium also uses high-yield large diameter pipes which were surplus on completion of North Sea gas pipeline projects in its compression truss, recycled granite, and many of the building products were transported using trains and barges rather than by lorry.


Olympic Stadium during the 2012 Summer Olympics

A wrap, funded by Dow Chemical Company in return for being able to advertise on the wrap until 26 June 2012, covered the exterior during the Olympics. The wrap was made from polyester and polyethylene, and printed using UV curable inks. 

The wrap was made of pieces of material that covered 20 metres (66 ft) high and 900 metres (1,000 yd) in length. The final design for the wrap consisted of 2.5-metre-wide (8 ft) fabric panels, twisted at 90-degree angles to allow entry to the stadium at the bottom of the structure, and held in place with tensioned cables.

To allow for fast on-site assembly, compression truss and roof column connections were bolted; this enabled easy disassembling of the roof structure after the closing ceremonies. The cable-supported roof structure covers approximately two-thirds of the stadium's seating.

Reaching 70 metres (230 ft) above the field of play, the stadium roof held 14 lighting towers, or paddles, that collectively contained a total of 532 individual 2 kW floodlight lamps. The lights were first officially switched on in December 2010 by Prime Minister David Cameron and London Mayor Boris Johnson. During the games, the towers were fitted with additional ceremony lighting, and 4 of the 14 towers held large temporary video screens.